GGSBY operates with a state-of-the-art infrastructure designed to facilitate safe and efficient ship recycling. The recycling yard features a 100% RCC-based impermeable floor, which prevents any leakage or contamination from ship materials into the ground. An effective drainage system ensures that no harmful substances enter the water or surrounding areas.
A key highlight of our facility is the 27-meter-wide floating barge in the intertidal area, equipped with two heavy lift crawler cranes. This unique system allows us to access the ship at any point and lift heavy blocks directly, ensuring no material contact with the intertidal mudflat. This reduces environmental risks and enhances safety.